Distribution / Sites / Customer

CBS SOLAR ASSETS UK LIMITED

Customer named in the DNOs’ registers

In NGED’s August 2026 and SSEN’s November 2026 editions

The registers spell this customer’s name more than one way: “CBS SOLAR ASSETS UK LIMITED” (1 site) and “Cbs solar assets uk limited” (1 site).

2sites of 1 MW and over
25.1 MWcapacity
25.1 MWconnected (2 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
NGEDAugust 2026 edition113.2 MW13.2 MW–
SSENNovember 2026 edition111.9 MW11.9 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar225.1 MW25.1 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Lodge hill solarNGEDDrakelow 132KvSolarConnected13.2
EAST FARMSSENNURSLING GSPSolarConnected11.875

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Drakelow 132KvNGED113.2 MW–
NURSLING GSPSSEN111.9 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.

  • EAST FARMSSEN, April 2025 editionTechnology stated as Solar (not stated in the March 2025 edition)
  • EAST FARMSSEN, November 2023 editionCapacity changed from 12.5 MW to 11.875 MW
  • EAST FARMSSEN, November 2023 editionTechnology not stated (Solar in the October 2023 edition)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips