Distribution / Sites / Customer

EVANS ENERGY LTD

Customer named in the DNOs’ registers

In UKPN’s November 2026, NGED’s August 2026, SSEN’s November 2026 and SPEN’s September 2026 editions

The registers spell this customer’s name more than one way: “EVANS ENERGY LTD” (3 sites), “Evans energy ltd” (3 sites), “Evans Energy Limited” (1 site) and “Evans Energy Ltd” (1 site).

8sites of 1 MW and over
273 MWcapacity
4 MWconnected (1 site)
269 MWaccepted to connect (7 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition14.1 MW4.1 MW–
NGEDAugust 2026 edition373 MW–73 MW
SSENNovember 2026 edition3125 MW–125 MW
SPENSeptember 2026 edition170.4 MW–70.4 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Wind3115 MW–115 MW
Solar380.1 MW4.1 MW76 MW
Storage277.4 MW–77.4 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
GlenfarmSPENTonglandStorageAccepted to connect70.4
NAN CLACH EXTENSIONSSENBOAT OF GARTENWindAccepted to connect70
LAND NEAR HAWTHORNE FARMHOUSESSENMANNINGTON GSPSolarAccepted to connect48
Trevarthian solar parkNGEDIndian Queens SgpSolarAccepted to connect28
Helland wind farmNGEDIndian Queens SgpWindAccepted to connect25
Proposed wind farmNGEDIndian Queens SgpWindAccepted to connect20
BRILLIANT HARVEST 004 LTD - BATTERY (ADD CAP)SSENMELKSHAM GSPStorageAccepted to connect7
Hermitage Solar FarmUKPNSundonSolarConnected4.1

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Indian Queens SgpNGED3–73 MW
TonglandSPEN1–70.4 MW
BOAT OF GARTENSSEN1–70 MW
MANNINGTON GSPSSEN1–48 MW
MELKSHAM GSPSSEN1–7 MW
SundonUKPN14.1 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 3 sites matched. Every October site and every November site had a match in the other edition.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 1 site matched. Every August site and every September site had a match in the other edition.

  • GlenfarmSPEN, May 2026 editionFlexible connection changed from “no” to “yes”
  • GlenfarmSPEN, May 2026 editionIn a connection queue changed from “no” to “yes”
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose