QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Northern Powergrid / Grid supply point

Blyth 66kV

Grid supply point in North East (Northern Powergrid)

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

25sites of 1 MW and over
602 MWcapacity
140 MWconnected (15 sites)
462 MWaccepted to connect (10 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar7224 MW4 MW220 MW
Storage4184 MW–184 MW
Wind8153 MW94 MW59 MW
Bioenergy and waste540.1 MW40.1 MW–
Gas and other fossil11.7 MW1.7 MW–

Storage capacity: 2 sites here state 220 MWh, 220 MWh accepted to connect.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Blyth 66kV2–100 MW
Blyth 66kV241.5 MW58.4 MW
Blyth 66kV2–84 MW
Blyth 66kV2–82.2 MW
Blyth 66kV1–59.8 MW
Blyth 66kV1–50 MW
Blyth 66kV131.7 MW–
Blyth 66kV1–28.1 MW
Blyth 66kV118.5 MW–
Blyth 66kV115 MW–
Blyth 66kV18.2 MW–
Blyth 66kV47.2 MW–
Blyth 66kV26.4 MW–
Blyth 66kV14 MW–
Blyth 66kV13.8 MW–
Blyth 66kV12.2 MW–
Blyth 66kV11.4 MW–

Search and filter all 25 sites at Blyth 66kV

What changed recently

Changes to sites here found in both editions of each pair, newest first.

October 2026 edition to November 2026 edition: 25 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.

No change to any detail QueueWatch tracks for these sites so far.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.