Grimsby West
Grid supply point in Yorkshire (Northern Powergrid)
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 17 | 1.0 GW | 0.1 GW | 0.9 GW |
| Gas and other fossil | 18 | 326 MW | 247 MW | 79 MW |
| Storage | 4 | 290 MW | 80 MW | 210 MW |
| Wind | 5 | 75 MW | 26 MW | 49 MW |
| Bioenergy and waste | 3 | 75 MW | 4 MW | 71 MW |
Storage capacity: 2 sites here state 439 MWh, 40 MWh connected and 399 MWh accepted to connect.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Little Becks Hybrid | 1 | – | 300 MW | |||||||||||||||||||||||||||||||
1 site, 300 MW: 300 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Netherlands Way | 2 | – | 94 MW | |||||||||||||||||||||||||||||||
2 sites, 94 MW: 94 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Netherlands Way | 1 | – | 80 MW | |||||||||||||||||||||||||||||||
1 site, 80 MW: 80 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Netherlands Way | 1 | – | 60 MW | |||||||||||||||||||||||||||||||
1 site, 60 MW: 60 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Netherlands Way | 1 | – | 21 MW | |||||||||||||||||||||||||||||||
1 site, 21 MW: 21 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | 59.1 MW | – | |||||||||||||||||||||||||||||||
1 site, 59.1 MW: 59.1 MW connected
| ||||||||||||||||||||||||||||||||||
| Immingham | 5 | 22.9 MW | 20.2 MW | |||||||||||||||||||||||||||||||
5 sites, 43.1 MW: 22.9 MW connected, 20.2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | 39 MW | – | |||||||||||||||||||||||||||||||
1 site, 39 MW: 39 MW connected
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | – | 30 MW | |||||||||||||||||||||||||||||||
1 site, 30 MW: 30 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | 24 MW | – | |||||||||||||||||||||||||||||||
1 site, 24 MW: 24 MW connected
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | 24 MW | – | |||||||||||||||||||||||||||||||
1 site, 24 MW: 24 MW connected
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | 15 MW | – | |||||||||||||||||||||||||||||||
1 site, 15 MW: 15 MW connected
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | 4 MW | – | |||||||||||||||||||||||||||||||
1 site, 4 MW: 4 MW connected
| ||||||||||||||||||||||||||||||||||
| Immingham | 1 | 4 MW | – | |||||||||||||||||||||||||||||||
1 site, 4 MW: 4 MW connected
| ||||||||||||||||||||||||||||||||||
| Ludborough 2 PV | 1 | – | 180 MW | |||||||||||||||||||||||||||||||
1 site, 180 MW: 180 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| West Grimsby Farm | 1 | – | 150 MW | |||||||||||||||||||||||||||||||
1 site, 150 MW: 150 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Yarborough Road 132/33kV | 3 | 58 MW | – | |||||||||||||||||||||||||||||||
3 sites, 58 MW: 58 MW connected
| ||||||||||||||||||||||||||||||||||
| Yarborough Road 132/33kV | 2 | 50.7 MW | – | |||||||||||||||||||||||||||||||
2 sites, 50.7 MW: 50.7 MW connected
| ||||||||||||||||||||||||||||||||||
| Yarborough Road 132/33kV | 1 | 16.3 MW | – | |||||||||||||||||||||||||||||||
1 site, 16.3 MW: 16.3 MW connected
| ||||||||||||||||||||||||||||||||||
| Yarborough Road 132/33kV | 2 | 8 MW | 3 MW | |||||||||||||||||||||||||||||||
2 sites, 11 MW: 8 MW connected, 3 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Yarborough Road 132/33kV | 1 | 1.4 MW | – | |||||||||||||||||||||||||||||||
1 site, 1.4 MW: 1.4 MW connected
| ||||||||||||||||||||||||||||||||||
| Yarborough Road 132/33kV | 1 | 1 MW | – | |||||||||||||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| ||||||||||||||||||||||||||||||||||
| Brocklesby | 1 | – | 80 MW | |||||||||||||||||||||||||||||||
1 site, 80 MW: 80 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BSB BESS | 1 | 80 MW | – | |||||||||||||||||||||||||||||||
1 site, 80 MW: 80 MW connected
| ||||||||||||||||||||||||||||||||||
| Weelsby Farm | 1 | – | 65 MW | |||||||||||||||||||||||||||||||
1 site, 65 MW: 65 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Humberston | 1 | – | 32 MW | |||||||||||||||||||||||||||||||
1 site, 32 MW: 32 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Humberston | 1 | 20 MW | – | |||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW connected
| ||||||||||||||||||||||||||||||||||
| Humberston | 1 | 4.6 MW | – | |||||||||||||||||||||||||||||||
1 site, 4.6 MW: 4.6 MW connected
| ||||||||||||||||||||||||||||||||||
| Humberston | 2 | 1.5 MW | 1.8 MW | |||||||||||||||||||||||||||||||
2 sites, 3.3 MW: 1.5 MW connected, 1.8 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Grimsby Solar | 1 | 50 MW | – | |||||||||||||||||||||||||||||||
1 site, 50 MW: 50 MW connected
| ||||||||||||||||||||||||||||||||||
| Grimsby West | 1 | – | 50 MW | |||||||||||||||||||||||||||||||
1 site, 50 MW: 50 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Queens Road Steam Turbine | 1 | – | 50 MW | |||||||||||||||||||||||||||||||
1 site, 50 MW: 50 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Great Coates PV | 1 | – | 49 MW | |||||||||||||||||||||||||||||||
1 site, 49 MW: 49 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Beelsby Hall Hybrid | 1 | – | 45 MW | |||||||||||||||||||||||||||||||
1 site, 45 MW: 45 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Moss Road | 3 | 4 MW | 7.5 MW | |||||||||||||||||||||||||||||||
3 sites, 11.5 MW: 4 MW connected, 7.5 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in Northern Powergrid’s November 2026 edition
6 sites last found at this grid supply point were not found among this edition’s sites of 1 MW and over by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.
- Beelsby Hall Hybrid last found in the July 2026 edition
- Great Coates PV last found in the July 2026 edition
- Knauf CHP last found in the July 2026 edition
- Netherlands Way Gas last found in the July 2026 edition
- Youngs Seafood CHP last found in the July 2026 edition
- Butt Lane BESS last found in the June 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 46 sites matched. 1 site at this grid supply point couldn’t be matched between the two editions, because its details changed or it appears in only one.
1 site without a match in the other edition
In the November 2026 edition only (1)
- Princess of Wales HospitalYorkshire (Northern Powergrid)Accepted to connect1.842 MW
- Western School PVSeptember 2026 editionStatus changed from “accepted to connect” to “connected”
- Grimsby SolarApril 2026 editionStatus changed from “accepted to connect” to “connected”
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.