Norton
Grid supply point in North East (Northern Powergrid)
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 35 | 1.2 GW | 0.2 GW | 1.0 GW |
| Storage | 6 | 594 MW | – | 594 MW |
| Bioenergy and waste | 10 | 129 MW | 64 MW | 65 MW |
| Gas and other fossil | 13 | 51.3 MW | 46.6 MW | 4.7 MW |
| Wind | 3 | 30.4 MW | 30.4 MW | – |
Storage capacity: 5 sites here state 679 MWh, 679 MWh accepted to connect.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Leeming Bar/Skeeby | 1 | – | 100 MW | |||||||||||||||||||||||||||||||
1 site, 100 MW: 100 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 2 | 39 MW | 50 MW | |||||||||||||||||||||||||||||||
2 sites, 89 MW: 39 MW connected, 50 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | 73.2 MW | – | |||||||||||||||||||||||||||||||
1 site, 73.2 MW: 73.2 MW connected
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | – | 49.5 MW | |||||||||||||||||||||||||||||||
1 site, 49.5 MW: 49.5 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | – | 30 MW | |||||||||||||||||||||||||||||||
1 site, 30 MW: 30 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | – | 25 MW | |||||||||||||||||||||||||||||||
1 site, 25 MW: 25 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | – | 22.5 MW | |||||||||||||||||||||||||||||||
1 site, 22.5 MW: 22.5 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | 12.5 MW | – | |||||||||||||||||||||||||||||||
1 site, 12.5 MW: 12.5 MW connected
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | 9.3 MW | – | |||||||||||||||||||||||||||||||
1 site, 9.3 MW: 9.3 MW connected
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 2 | 9 MW | – | |||||||||||||||||||||||||||||||
2 sites, 9 MW: 9 MW connected
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 2 | 5.4 MW | – | |||||||||||||||||||||||||||||||
2 sites, 5.4 MW: 5.4 MW connected
| ||||||||||||||||||||||||||||||||||
| Leeming Bar/Skeeby | 1 | 5 MW | – | |||||||||||||||||||||||||||||||
1 site, 5 MW: 5 MW connected
| ||||||||||||||||||||||||||||||||||
| Mill Lane | 2 | – | 360 MW | |||||||||||||||||||||||||||||||
2 sites, 360 MW: 360 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | – | 64.3 MW | |||||||||||||||||||||||||||||||
1 site, 64.3 MW: 64.3 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | – | 61.9 MW | |||||||||||||||||||||||||||||||
1 site, 61.9 MW: 61.9 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | – | 40 MW | |||||||||||||||||||||||||||||||
1 site, 40 MW: 40 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | – | 39 MW | |||||||||||||||||||||||||||||||
1 site, 39 MW: 39 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | – | 35 MW | |||||||||||||||||||||||||||||||
1 site, 35 MW: 35 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | 23 MW | – | |||||||||||||||||||||||||||||||
1 site, 23 MW: 23 MW connected
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | 12.3 MW | – | |||||||||||||||||||||||||||||||
1 site, 12.3 MW: 12.3 MW connected
| ||||||||||||||||||||||||||||||||||
| Darlington North | 3 | 12.1 MW | – | |||||||||||||||||||||||||||||||
3 sites, 12.1 MW: 12.1 MW connected
| ||||||||||||||||||||||||||||||||||
| Darlington North | 2 | 5.6 MW | – | |||||||||||||||||||||||||||||||
2 sites, 5.6 MW: 5.6 MW connected
| ||||||||||||||||||||||||||||||||||
| Darlington North | 1 | 2.3 MW | – | |||||||||||||||||||||||||||||||
1 site, 2.3 MW: 2.3 MW connected
| ||||||||||||||||||||||||||||||||||
| North Tees | 2 | – | 54.9 MW | |||||||||||||||||||||||||||||||
2 sites, 54.9 MW: 54.9 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| North Tees | 1 | 23 MW | – | |||||||||||||||||||||||||||||||
1 site, 23 MW: 23 MW connected
| ||||||||||||||||||||||||||||||||||
| North Tees | 1 | 20.1 MW | – | |||||||||||||||||||||||||||||||
1 site, 20.1 MW: 20.1 MW connected
| ||||||||||||||||||||||||||||||||||
| North Tees | 4 | 12.9 MW | 1.3 MW | |||||||||||||||||||||||||||||||
4 sites, 14.2 MW: 12.9 MW connected, 1.3 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| North Tees | 2 | 10.8 MW | – | |||||||||||||||||||||||||||||||
2 sites, 10.8 MW: 10.8 MW connected
| ||||||||||||||||||||||||||||||||||
| North Tees | 1 | – | 10 MW | |||||||||||||||||||||||||||||||
1 site, 10 MW: 10 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| North Tees | 1 | 10 MW | – | |||||||||||||||||||||||||||||||
1 site, 10 MW: 10 MW connected
| ||||||||||||||||||||||||||||||||||
| North Tees | 1 | 4.9 MW | – | |||||||||||||||||||||||||||||||
1 site, 4.9 MW: 4.9 MW connected
| ||||||||||||||||||||||||||||||||||
| North Tees | 1 | 3 MW | – | |||||||||||||||||||||||||||||||
1 site, 3 MW: 3 MW connected
| ||||||||||||||||||||||||||||||||||
| North Tees | 1 | 1.6 MW | – | |||||||||||||||||||||||||||||||
1 site, 1.6 MW: 1.6 MW connected
| ||||||||||||||||||||||||||||||||||
| California Farm | 1 | – | 150 MW | |||||||||||||||||||||||||||||||
1 site, 150 MW: 150 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Thornley Close Farm | 1 | – | 119 MW | |||||||||||||||||||||||||||||||
1 site, 119 MW: 119 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Bowesfield | 1 | – | 50 MW | |||||||||||||||||||||||||||||||
1 site, 50 MW: 50 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Bowesfield | 1 | – | 46.2 MW | |||||||||||||||||||||||||||||||
1 site, 46.2 MW: 46.2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Bowesfield | 1 | 10.3 MW | – | |||||||||||||||||||||||||||||||
1 site, 10.3 MW: 10.3 MW connected
| ||||||||||||||||||||||||||||||||||
| Bowesfield | 2 | 2 MW | 4.7 MW | |||||||||||||||||||||||||||||||
2 sites, 6.7 MW: 2 MW connected, 4.7 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Bowesfield | 1 | 3.7 MW | – | |||||||||||||||||||||||||||||||
1 site, 3.7 MW: 3.7 MW connected
| ||||||||||||||||||||||||||||||||||
| Darlington Central | 1 | – | 38 MW | |||||||||||||||||||||||||||||||
1 site, 38 MW: 38 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington Central | 3 | 7.5 MW | 23 MW | |||||||||||||||||||||||||||||||
3 sites, 30.5 MW: 7.5 MW connected, 23 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington Central | 1 | – | 19 MW | |||||||||||||||||||||||||||||||
1 site, 19 MW: 19 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Darlington Central | 1 | 3.4 MW | – | |||||||||||||||||||||||||||||||
1 site, 3.4 MW: 3.4 MW connected
| ||||||||||||||||||||||||||||||||||
| Norton Back Lane | 1 | – | 89.9 MW | |||||||||||||||||||||||||||||||
1 site, 89.9 MW: 89.9 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Hell Hole Farm | 1 | – | 80 MW | |||||||||||||||||||||||||||||||
1 site, 80 MW: 80 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Ketton Solar | 1 | – | 52 MW | |||||||||||||||||||||||||||||||
1 site, 52 MW: 52 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Norton 132/11kV | 5 | 17.4 MW | 8.6 MW | |||||||||||||||||||||||||||||||
5 sites, 26 MW: 17.4 MW connected, 8.6 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in Northern Powergrid’s November 2026 edition
1 site last found at this grid supply point was not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode. QueueWatch keeps its page for six months and does not say whether it has left the register.
- Hill House Hybrid last found in the August 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 67 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
- Station Road CHPOctober 2026 editionCapacity changed from 3.8 MW to 4.7 MW
- Station Road CHPOctober 2026 editionCustomer changed from Jan Bezemer And Sons Ltd to Station Road CHP
- Station Road CHPOctober 2026 editionExport capacity changed from 3.8 MW to 4.7 MW
- Station Road CHPOctober 2026 editionStatus changed from “connected” to “accepted to connect”
- Land south of Skeeby SubstationAugust 2026 editionExport capacity changed from 73.23 MW to 39.33 MW
- Land south of Skeeby SubstationAugust 2026 editionStatus changed from “accepted to connect” to “connected”
- California Hybrid Solar & BESSJune 2026 editionFlexible connection changed from “no” to “yes”
- Land south of Skeeby SubstationJune 2026 editionCapacity changed from 39.33 MW to 73.23 MW
- Land south of Skeeby SubstationJune 2026 editionExport capacity changed from 39.33 MW to 73.23 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.