QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / SSEN / Grid supply point

ARDMORE GRID

Grid supply point in North of Scotland (SHEPD)

SSEN Embedded Capacity Register, November 2026 edition

30sites of 1 MW and over
258 MWcapacity
79 MWconnected (22 sites)
179 MWaccepted to connect (8 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Wind12183 MW29 MW154 MW
Gas and other fossil1336.5 MW36.5 MW–
Storage125 MW–25 MW
Solar17.5 MW7.5 MW–
Other or not stated36 MW6 MW–

Storage capacity in MWh: not published by SSEN.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Not stated1025 MW173 MW
Not stated718.9 MW6.9 MW
Not stated825.1 MW–
Not stated12.9 MW–
Not stated11.8 MW–
Not stated11.4 MW–
Not stated23.1 MW–

Search and filter all 30 sites at ARDMORE GRID

What changed recently

Changes to sites here found in both editions of each pair, newest first.

October 2026 edition to November 2026 edition: 30 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.

  • ARNISH COMMUNITY WIND FARMNovember 2026 editionExport capacity changed from 38.92 MW to 0.41 MW
  • ARNISH COMMUNITY WIND FARMOctober 2026 editionExport capacity changed from 0.41 MW to 38.92 MW
  • ARNISH COMMUNITY WIND FARMAugust 2026 editionExport capacity changed from 38.92 MW to 0.41 MW
  • ARNISH COMMUNITY WIND FARMFebruary 2026 editionExport capacity changed from 35 MW to 38.92 MW
  • LOCH CARNON G1April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • LOCH CARNON G2April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • LOCH CARNON G3April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • LOCH CARNON G4April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • LOCH CARNON G5April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G1April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G1April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G3April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G5April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G6April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G8April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G9April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
  • STORNOWAY PS G9April 2025 editionTechnology stated as Gas and other fossil (not stated in the March 2025 edition)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.