COUPAR ANGUS
Grid supply point in North of Scotland (SHEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 6 | 331 MW | – | 331 MW |
| Other or not stated | 2 | 174 MW | – | 174 MW |
| Storage | 3 | 138 MW | 38 MW | 100 MW |
| Wind | 7 | 73.9 MW | 62.7 MW | 11.2 MW |
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not stated | 11 | 63 MW | 269 MW | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 sites, 332 MW: 63 MW connected, 269 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 1 | – | 2 MW | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 site, 2 MW: 2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 6 | 38 MW | 345 MW | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6 sites, 383 MW: 38 MW connected, 345 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in SSEN’s November 2026 edition
1 site last found at this grid supply point was not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode. QueueWatch keeps its page for six months and does not say whether it has left the register.
- DOUGLASIE PV+BESS last found in the May 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 18 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
- 49.9MW BESSDecember 2025 editionCustomer not stated (name not shown in the November 2025 edition)
- 99.56MW PV/BESSDecember 2023 editionCapacity changed from 25 MW to 99.56 MW
- 99.56MW PV/BESSDecember 2023 editionExport capacity changed from 25 MW to 49.8 MW
- 99.56MW PV/BESSNovember 2023 editionCapacity changed from 99.56 MW to 25 MW
- 99.56MW PV/BESSNovember 2023 editionExport capacity changed from 49.8 MW to 25 MW
- WELTON OF CREUCHIES WIND FARM S2November 2023 editionCapacity changed from 9.2 MW to 8.74 MW
- 49.9MW BESSSeptember 2023 editionCustomer stated, name not shown (not stated in the August 2023 edition)
- 99.56MW PV/BESSSeptember 2023 editionCapacity changed from 25 MW to 99.56 MW
- 99.56MW PV/BESSSeptember 2023 editionExport capacity changed from 25 MW to 49.8 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.