PETERHEAD GRANGE
Grid supply point in North of Scotland (SHEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | |||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not stated | 4 | 28 MW | 195 MW | ||||||||||||||||||||||||||
4 sites, 223 MW: 28 MW connected, 195 MW accepted to connect
| |||||||||||||||||||||||||||||
| Not stated | 1 | – | 50.2 MW | ||||||||||||||||||||||||||
1 site, 50.2 MW: 50.2 MW accepted to connect
| |||||||||||||||||||||||||||||
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 5 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
- WELLS FOREST FARM 25MWOctober 2026 editionExport capacity changed from 50.16 MW to 26.5 MW
- STONEYHILL FARM 49.9MWSeptember 2026 editionExport capacity changed from 99.95 MW to 52.53 MW
- STONEYHILL FARM 49.9MWAugust 2026 editionExport capacity changed from 52.53 MW to 99.95 MW
- STONEYHILL FARM 49.9MWJuly 2026 editionExport capacity changed from 99.95 MW to 52.53 MW
- STONEYHILL FARM 49.9MWJune 2026 editionExport capacity changed from 52.53 MW to 99.95 MW
- STONEYHILL FARM 49.9MWMay 2026 editionExport capacity changed from 99.95 MW to 52.53 MW
- WELLS FOREST FARM 25MWMay 2026 editionExport capacity changed from 26.5 MW to 50.16 MW
- STONEYHILL FARM 49.9MWApril 2026 editionExport capacity changed from 52.53 MW to 99.95 MW
- STONEYHILL FARM 49.9MWFebruary 2026 editionExport capacity changed from 49.9 MW to 52.53 MW
- WELLS FOREST FARM 25MWFebruary 2026 editionExport capacity changed from 25 MW to 26.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.