WELLBANK
GREENTECH PROJECTS HOLDING UK LIMITED at MILTON OF CRAIGIE
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 26 Aug 2030
- Status
- Accepted to connect
- Planning consent
- Granted 15 Feb 2024
Angus, reference 23/00424/FULM · Source: REPD - Contract for Difference
- Allocation Round 7a
- Customer
- GREENTECH PROJECTS HOLDING UK LIMITED
- Site name
- WELLBANK
- Address
- WELLBANK, BROUGHTY FERRY, DUNDEE, ANGUS, DD5 3PN
- Grid reference
- Easting 346588, northing 737434
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- MILTON OF CRAIGIE
- Bulk supply point
- Not stated
- Primary substation
- MILTON OF CRAIGIE GRID
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 25 MW registered
- Registered capacity
- 25 MW
- Change to maximum export capacity
- 25 MW
- Change to maximum import capacity
- 0.5 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 26 Aug 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2025 edition
Change history
Tracked since the September 2025 edition, across 15 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 26 Aug 2030 (not stated in the October 2025 edition)
Also at MILTON OF CRAIGIE
GSP view5 other sites at this grid supply point in the November 2026 edition, 4 of them at MILTON OF CRAIGIE GRID, the same primary substation. In all, the sites here total 147 MW: 22 MW connected, 125 MW accepted to connect.
- MIDMILL GASHOLDER STATIONVITAL ENERGI SOLUTIONS LIMITED, Storage, MILTON OF CRAIGIE GRID primaryAccepted49.9 MW
- BALDOVIE EFW LINE 3MVV ENVIRONMENT BALDOVIE LIMITED, Bioenergy and waste, MILTON OF CRAIGIE GRID primaryConnected9.499 MW
- BALDOVIE WASTE TO ENERGY PLANTMVV ENVIRONMENT BALDOVIE LIMITED, Bioenergy and waste, MILTON OF CRAIGIE GRID primaryConnected8.265 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.
Contract for Difference
The Contracts for Difference allocation round for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition. QueueWatch matched the site to that record.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.