STRATHRORY WIND FARM

ENERGIE KONTOR at ALNESS

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Jun 2025
Status
Accepted to connect
Customer
ENERGIE KONTOR
Site name
STRATHRORY WIND FARM
Address
STRATHRORY WIND FARM, B9176 STITTENHAM ARDROSS, ALNESS, HIGHLAND, IV17 0XP
Grid reference
Easting 265243, northing 873413
Licence area
North of Scotland (SHEPD)
Grid supply point
ALNESS
Bulk supply point
Not stated
Primary substation
ALNESS GRID
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 38.4 MW registered
Registered capacity
38.4 MW
Change to maximum export capacity
36 MW
Change to maximum import capacity
0.5 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
16 Dec 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked from the August 2023 edition to the September 2026 edition, across 37 editions. Not found at 1 MW or over in the December 2024 edition.

Changes to the details QueueWatch tracks, newest first.

  • October 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
  • November 2025 edition
    Target energisation date stated as 30 Jun 2025 (not stated in the October 2025 edition)
  • December 2024 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

Also at ALNESS

GSP view

15 other sites at this grid supply point in the November 2026 edition, 11 of them at ALNESS GRID, the same primary substation. In all, the sites here total 411 MW: 159 MW connected, 252 MW accepted to connect.

See all 15

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?