4.8MW TIDAL

EUROPEAN MARINE ENERGY CENTRE at THURSO

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Mar 2026
Status
Accepted to connect
Planning consent
Application submitted 13 Dec 2023
Marine Scotland · Source: REPD
Contract for Difference
Allocation Round 5
Customer
EUROPEAN MARINE ENERGY CENTRE
Site name
4.8MW TIDAL
Address
WEST SIDE ROAD CALDALE EDAY, ORKNEY, ORKNEY ISLANDS, KW17 2AA
Grid reference
Easting 356219, northing 1030832
Licence area
North of Scotland (SHEPD)
Grid supply point
THURSO
Bulk supply point
Not stated
Primary substation
SCORRADALE
Connection voltage
33 kV
Technology group
Hydro and marine
Energy source 1
WATER (FLOWING WATER OR HEAD OF WATER), HYDRO - OTHER: 4.8 MW registered
Registered capacity
4.8 MW
Change to maximum export capacity
4.8 MW
Change to maximum import capacity
0.105 MW
Flexible connection
Yes
In a connection queue
Not published by SSEN
Date accepted
3 Nov 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • July 2026 edition
    Flexible connection stated as “yes” (not stated in the June 2026 edition)
  • November 2025 edition
    Target energisation date stated as 31 Mar 2026 (not stated in the October 2025 edition)

Also at THURSO

GSP view

24 other sites at this grid supply point in the November 2026 edition, 8 of them at SCORRADALE, the same primary substation. In all, the sites here total 379 MW: 38 MW connected, 341 MW accepted to connect.

See all 24

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.

Contract for Difference

The Contracts for Difference allocation round for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition. QueueWatch matched the site to that record.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.