HALE SOLAR
HALE at MANNINGTON GSP
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 22 Dec 2015
- Status
- Connected
- Planning consent
- Granted 23 Sep 2015
Bournemouth, Christchurch and Poole, reference 8/14/0520 · Source: REPD - Customer
- HALE
- Site name
- HALE SOLAR
- Address
- EXPORT, CHAPEL LANE, CHRISTCHURCH, DORSET, BH23 6BG
- Grid reference
- Easting 409981, northing 99040
- Licence area
- Southern England (SEPD)
- Grid supply point
- MANNINGTON GSP
- Bulk supply point
- REDHILL
- Primary substation
- REDHILL
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 4.731 MW registered
- Registered capacity
- 4.731 MW
- Maximum export capacity
- 4.731 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000056413768
- Import MPAN
- Not stated
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2023 editionCapacity changed from 5.242 MW to 4.731 MW
Also at MANNINGTON GSP
GSP view92 other sites at this grid supply point in the November 2026 edition, 5 of them at REDHILL, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.
- BERRY HILL SLUDGE TREATMENT CENTREWESSEX WATER SERVICES LIMITED, Storage, REDHILL primaryConnected1.399 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.