QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

RAF LOSSIEMOUTH

DEFENCE INFASTRUCTURE ORGANISATION at ELGIN

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
16 Oct 2025
Status
Accepted to connect
Planning consent
Granted 4 Sep 2026
Moray, reference 26/00589/APP · Source: REPD
Customer
DEFENCE INFASTRUCTURE ORGANISATION
Site name
RAF LOSSIEMOUTH
Address
ROYAL AIR FORCE, LOSSIEMOUTH, MORAY, IV31 6SD
Grid reference
Easting 322168, northing 869702
Licence area
North of Scotland (SHEPD)
Grid supply point
ELGIN
Bulk supply point
Not stated
Primary substation
ELGIN GRID
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 4.95 MW registered
Registered capacity
4.95 MW
Change to maximum export capacity
0 MW
Change to maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
16 Oct 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
December 2024 edition

Change history

Tracked since the December 2024 edition, across 24 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 16 Oct 2025 (not stated in the October 2025 edition)

Also at ELGIN

GSP view

7 other sites at this grid supply point in the November 2026 edition, 6 of them at ELGIN GRID, the same primary substation. In all, the sites here total 525 MW: 525 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.