PATRICKSTON FARM - PV + BATTERY

GREEN ENERGY INTERNATIONAL at BRACO WEST GRID

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Jun 2025
Status
Accepted to connect
Planning consent
Permission expired 5 Apr 2023
Stirling, reference 19/00915/FUL · Source: REPD
Customer
GREEN ENERGY INTERNATIONAL
Site name
PATRICKSTON FARM - PV + BATTERY
Address
PATRICKSTON FARM, KIPPENROSS, DUNBLANE, STIRLING, FK8 3JJ
Grid reference
Easting 270074, northing 695823
Licence area
North of Scotland (SHEPD)
Grid supply point
BRACO WEST GRID
Bulk supply point
Not stated
Primary substation
BRACO WEST GRID
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 15.9 MW registered
Registered capacity
15.9 MW
Change to maximum export capacity
9.9 MW
Change to maximum import capacity
6 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
31 Jan 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
February 2024 edition

Change history

Tracked since the February 2024 edition, across 34 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 30 Jun 2025 (not stated in the October 2025 edition)

Also at BRACO WEST GRID

GSP view

9 other sites at this grid supply point in the November 2026 edition, 6 of them at BRACO WEST GRID, the same primary substation. In all, the sites here total 328 MW: 33 MW connected, 295 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.