Distribution / UKPN / Grid supply point

Bolney

Grid supply point in South Eastern Power Networks (SPN)

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

46sites of 1 MW and over
1.4 GWcapacity
0.6 GWconnected (28 sites)
0.8 GWaccepted to connect (18 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Storage12709 MW52 MW657 MW
Gas and other fossil5474 MW474 MW–
Solar17192 MW37 MW155 MW
Bioenergy and waste1267.5 MW43.4 MW24.1 MW

Storage capacity in MWh: no site here states any.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Leigh Grid 33kV27.1 MW–
Leigh Grid 33kV11.9 MW–
Leigh Grid 33kV11.2 MW–
Leigh Grid 33kV11.1 MW–
Leigh Grid 33kV220.5 MW30 MW
Three Bridges1–49.9 MW
Goddards Green Grid 33kV14 MW–
Goddards Green Grid 33kV11 MW–
Goddards Green Grid 33kV135.8 MW–
Worthing Grid A 33kV13 MW–
Worthing Grid A 33kV1–36 MW
Bolney Grid 33kV12.2 MW–
Bolney Grid 33kV317.5 MW14 MW
Steyning Grid 33kV28.6 MW–
Steyning Grid 33kV23.4 MW–
Steyning Grid 33kV110 MW–
Bolney Grid1–20 MW
Steyning Grid1–15 MW
Steyning Grid1–5 MW
Leigh Grid1–11.3 MW
Worthing Grid B 33kV210.4 MW–
Smallfield Grid 33kV16 MW–
Three Bridges Local 33kV14 MW–
Three Bridges Local 33kV11 MW–
Horsham 132 KV1–3.1 MW
Fishersgate Grid 33kV11.3 MW–
Not stated46.1 MW21 MW
Not stated90.5 GW0.6 GW

Search and filter all 46 sites at Bolney

What changed recently

Changes to sites here found in both editions of each pair, newest first.

October 2026 edition to November 2026 edition: 46 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.

  • Bolney SolarNovember 2026 editionTarget energisation date moved from 31 Dec 2030 to 31 Dec 2031 (12 months later)
  • Broomfield Solar FarmNovember 2026 editionTarget energisation date moved from 18 Oct 2027 to 28 Oct 2027 (10 days later)
  • Broomfield Solar FarmNovember 2026 editionTarget energisation date moved from 31 Dec 2030 to 31 Dec 2031 (12 months later)
  • Coombe FarmNovember 2026 editionTarget energisation date moved from 31 Jan 2029 to 31 Oct 2027 (15 months earlier)
  • Envirtotech 3November 2026 editionTarget energisation date moved from 31 Oct 2026 to 28 Oct 2027 (12 months later)
  • Gatwick Airport Electric ForecourtNovember 2026 editionTarget energisation date not stated (30 Sep 2024 in the October 2026 edition)
  • Halewick LaneNovember 2026 editionTarget energisation date moved from 31 Dec 2024 to 18 Dec 2026 (24 months later)
  • Ironsbottom Solar FarmNovember 2026 editionTarget energisation date moved from 31 Dec 2030 to 31 Dec 2031 (12 months later)
  • Little Flanchford FarmNovember 2026 editionTarget energisation date moved from 31 Dec 2030 to 31 Dec 2031 (12 months later)
  • Wealden WorksNovember 2026 editionTarget energisation date moved from 31 Oct 2025 to 31 Oct 2026 (12 months later)
  • Wineham LaneNovember 2026 editionTarget energisation date moved from 31 Oct 2026 to 31 Oct 2027 (12 months later)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.