QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Bank Farm Solar

Skyfall Energy Limited at Sellindge

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Dec 2028
Status
Accepted to connect
Customer
Skyfall Energy Limited
Site name
Bank Farm Solar
Address
Bank Road, Aldington, Ashford, Kent, TN25 7DF
Grid reference
Easting 605520, northing 137149
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Sellindge
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 99.9 MW registered
Registered capacity
99.9 MW
Change to maximum export capacity
99.9 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Yes
Date accepted
15 Apr 2020
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Nov 2026
Tracked since
September 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2026 edition
    Target energisation date moved from 31 Jan 2025 to 31 Dec 2028 (47 months later)

Also at Sellindge

GSP view

5 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 264 MW: 264 MW accepted to connect.

  • Park FarmEcoenergy Renewable Energy Limited, Solar, Sellindge Local 33kV primaryAccepted49.9 MW
  • Thornton RoadPathfinder Clean Energy (PACE) UKDEV Limited, Solar, Sellindge 132kV primaryAccepted48.1 MW
  • Appledore RoadQc Cronan Limited, SolarAccepted35 MW
  • St.Marys RoadSt Mary In The Marsh Renewable Energy Limited, Solar, Ruckinge Grid 33kV primaryAccepted16 MW
  • Eastry Solar FarmPadero Solaer Limited, Solar, Betteshanger primaryAccepted15.31 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose