BALANCED GRID SOLUTIONS LIMITED

Customer named in the DNOs’ registers

In UKPN’s November 2026 and SSEN’s November 2026 editions

The registers spell this customer’s name more than one way: “BALANCED GRID SOLUTIONS LIMITED” (4 sites), “BALANCED GRID SOLUTIONS LTD” (1 site) and “Balanced Grid Solutions” (1 site).

6sites of 1 MW and over
239 MWcapacity
–connected (0 sites)
239 MWaccepted to connect (6 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition149.9 MW–49.9 MW
SSENNovember 2026 edition5189 MW–189 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Storage5215 MW–215 MW
Solar124 MW–24 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
49.9MW - BATTERYSSENNURSLING GSPStorageAccepted to connect49.95
COWLEY BATTERY STORAGESSENCOWLEY GSPStorageAccepted to connect49.95
49.9MW BATTERYSSENNURSLING GSPStorageAccepted to connect49.9
Olives FarmUKPNNinfieldStorageAccepted to connect49.9
FAREHAM SOLAR 3SSENLOVEDEAN GSPSolarAccepted to connect24
BOTLEY ENERGY RESERVE 2SSENBOTLEY WOOD GSPStorageAccepted to connect15

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
NURSLING GSPSSEN2–99.9 MW
COWLEY GSPSSEN1–50 MW
NinfieldUKPN1–49.9 MW
LOVEDEAN GSPSSEN1–24 MW
BOTLEY WOOD GSPSSEN1–15 MW

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 5 sites matched. 1 site couldn’t be matched between the two editions, because its details changed or it appears in only one.

1 site without a match in the other edition
In the October 2026 edition only (1)
  • Olives FarmUKPN, November 2026 editionTarget energisation date moved from 31 Dec 2030 to 31 Dec 2027 (36 months earlier)
  • Olives FarmUKPN, October 2026 editionCapacity changed from 75 MW to 49.9 MW
  • Olives FarmUKPN, October 2026 editionExport capacity changed from 75 MW to 49.9 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose