BALANCED GRID SOLUTIONS LIMITED
Customer named in the DNOs’ registers
In UKPN’s November 2026 and SSEN’s November 2026 editions
The registers spell this customer’s name more than one way: “BALANCED GRID SOLUTIONS LIMITED” (4 sites), “BALANCED GRID SOLUTIONS LTD” (1 site) and “Balanced Grid Solutions” (1 site).
Capacity by DNO
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Storage | 5 | 215 MW | – | 215 MW |
| Solar | 1 | 24 MW | – | 24 MW |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs’ latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Site | DNO | Grid supply point | Technology | Status | MW |
|---|---|---|---|---|---|
| 49.9MW - BATTERY | SSEN | NURSLING GSP | Storage | Accepted to connect | 49.95 |
| COWLEY BATTERY STORAGE | SSEN | COWLEY GSP | Storage | Accepted to connect | 49.95 |
| 49.9MW BATTERY | SSEN | NURSLING GSP | Storage | Accepted to connect | 49.9 |
| Olives Farm | UKPN | Ninfield | Storage | Accepted to connect | 49.9 |
| FAREHAM SOLAR 3 | SSEN | LOVEDEAN GSP | Solar | Accepted to connect | 24 |
| BOTLEY ENERGY RESERVE 2 | SSEN | BOTLEY WOOD GSP | Storage | Accepted to connect | 15 |
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| NURSLING GSP | SSEN | 2 | – | 99.9 MW |
| COWLEY GSP | SSEN | 1 | – | 50 MW |
| Ninfield | UKPN | 1 | – | 49.9 MW |
| LOVEDEAN GSP | SSEN | 1 | – | 24 MW |
| BOTLEY WOOD GSP | SSEN | 1 | – | 15 MW |
What changed recently
Changes to its sites found in both editions of each pair, newest first.
UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.
SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 5 sites matched. 1 site couldn’t be matched between the two editions, because its details changed or it appears in only one.
1 site without a match in the other edition
In the October 2026 edition only (1)
- ABDN FARBURN TERRACE - BATTERYNorth of Scotland (SHEPD)Accepted to connect30 MW
- Olives FarmUKPN, November 2026 editionTarget energisation date moved from 31 Dec 2030 to 31 Dec 2027 (36 months earlier)
- Olives FarmUKPN, October 2026 editionCapacity changed from 75 MW to 49.9 MW
- Olives FarmUKPN, October 2026 editionExport capacity changed from 75 MW to 49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?