BOTLEY WOOD GSP
Grid supply point in Southern England (SEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Storage | 4 | 215 MW | 50 MW | 165 MW |
| Solar | 10 | 135 MW | 32 MW | 103 MW |
| Other or not stated | 2 | 69.4 MW | 19 MW | 50.4 MW |
| Bioenergy and waste | 1 | 1.2 MW | 1.2 MW | – |
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BOTLEY WOOD | 3 | – | 115 MW | |||||||||||||||||||||
3 sites, 115 MW: 115 MW accepted to connect
| ||||||||||||||||||||||||
| BOTLEY WOOD | 1 | 19 MW | – | |||||||||||||||||||||
1 site, 19 MW: 19 MW connected
| ||||||||||||||||||||||||
| BOTLEY WOOD | 1 | – | 3.8 MW | |||||||||||||||||||||
1 site, 3.8 MW: 3.8 MW accepted to connect
| ||||||||||||||||||||||||
| BOTLEY WOOD | 3 | 50 MW | 112 MW | |||||||||||||||||||||
3 sites, 162 MW: 50 MW connected, 112 MW accepted to connect
| ||||||||||||||||||||||||
| NETLEY COMMON | 3 | 7.3 MW | 10 MW | |||||||||||||||||||||
3 sites, 17.3 MW: 7.3 MW connected, 10 MW accepted to connect
| ||||||||||||||||||||||||
| NETLEY COMMON | 1 | 11.4 MW | – | |||||||||||||||||||||
1 site, 11.4 MW: 11.4 MW connected
| ||||||||||||||||||||||||
| NETLEY COMMON | 1 | 9.5 MW | – | |||||||||||||||||||||
1 site, 9.5 MW: 9.5 MW connected
| ||||||||||||||||||||||||
| NETLEY COMMON | 1 | 1.2 MW | – | |||||||||||||||||||||
1 site, 1.2 MW: 1.2 MW connected
| ||||||||||||||||||||||||
| NETLEY COMMON | 2 | 4.4 MW | 27 MW | |||||||||||||||||||||
2 sites, 31.4 MW: 4.4 MW connected, 27 MW accepted to connect
| ||||||||||||||||||||||||
| Not stated | 1 | – | 50.4 MW | |||||||||||||||||||||
1 site, 50.4 MW: 50.4 MW accepted to connect
| ||||||||||||||||||||||||
Not found among the sites of 1 MW and over in SSEN’s November 2026 edition
2 sites last found at this grid supply point were not found among this edition’s sites of 1 MW and over by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.
- Site not named last found in the June 2026 edition
- Site not named last found in the May 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 17 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
- 99.9MW BESS TITCHFIELD LANESeptember 2026 editionExport capacity changed from 105.263 MW to 100 MW
- 99.9MW BESS TITCHFIELD LANEAugust 2026 editionExport capacity changed from 100 MW to 105.263 MW
- 99.9MW BESS TITCHFIELD LANEJuly 2026 editionExport capacity changed from 105.263 MW to 100 MW
- 99.9MW BESS TITCHFIELD LANEMay 2026 editionExport capacity changed from 100 MW to 105.263 MW
- 99.9MW BESS TITCHFIELD LANEFebruary 2026 editionExport capacity changed from 99.9 MW to 100 MW
- 99.9MW BESS TITCHFIELD LANEJuly 2025 editionCustomer not stated (name not shown in the June 2025 edition)
- BOTLEY ENERGY RESERVE LIMITEDJuly 2025 editionExport capacity changed from 0 MW to 49.9 MW
- BOTLEY ENERGY RESERVE LIMITEDMay 2025 editionExport capacity changed from 49.9 MW to 0 MW
- BISHOPS WALTHAMApril 2025 editionTechnology stated as Solar (not stated in the March 2025 edition)
- BISHOPS WALTHAMNovember 2023 editionCapacity stated as 11.4 MW (not stated in the October 2023 edition)
- NETLEY PVNovember 2023 editionCapacity changed from 4.625 MW to 4.394 MW
- NETLEY PVNovember 2023 editionCustomer changed from ETHICAL POWER to EPG NETLEY SOLAR NORTH LIMITED
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.