99.9MW BESS TITCHFIELD LANE
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Jan 2027
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- 99.9MW BESS TITCHFIELD LANE
- Address
- LAND ON THE EAST OF TITCHFIELD LANE WICKHAM, FAREHAM, HAMPSHIRE, PO15 6DZ
- Grid reference
- Easting 455631, northing 109009
- Licence area
- Southern England (SEPD)
- Grid supply point
- BOTLEY WOOD GSP
- Bulk supply point
- BOTLEY WOOD
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 100 MW registered
- Registered capacity
- 100 MW
- Change to maximum export capacity
- 100 MW
- Change to maximum import capacity
- 105.263 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 28 May 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- June 2025 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the June 2025 edition, across 18 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionExport capacity changed from 105.263 MW to 100 MW
- August 2026 editionExport capacity changed from 100 MW to 105.263 MW
- July 2026 editionExport capacity changed from 105.263 MW to 100 MW
- May 2026 editionExport capacity changed from 100 MW to 105.263 MW
- February 2026 editionExport capacity changed from 99.9 MW to 100 MW
- November 2025 editionTarget energisation date stated as 31 Jan 2027 (not stated in the October 2025 edition)
- July 2025 editionCustomer not stated (name not shown in the June 2025 edition)
Also at BOTLEY WOOD GSP
GSP view16 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 421 MW: 103 MW connected, 318 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?