FIDDES
Grid supply point in North of Scotland (SHEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 5 | 182 MW | 5 MW | 177 MW |
| Storage | 3 | 133 MW | – | 133 MW |
| Wind | 10 | 91 MW | 81 MW | 10 MW |
| Other or not stated | 1 | 49.9 MW | – | 49.9 MW |
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not stated | 13 | 62 MW | 191 MW | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13 sites, 253 MW: 62 MW connected, 191 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 1 | 17 MW | – | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 site, 17 MW: 17 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 1 | – | <0.1 MW | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 site, <0.1 MW: <0.1 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 4 | 7 MW | 179 MW | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 sites, 186 MW: 7 MW connected, 179 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Listed at under 1 MW in SSEN’s November 2026 edition
1 site last listed here at 1 MW or over is listed in this edition at under 1 MW. QueueWatch keeps its page for six months.
- SALES SCOTLAND ENERGETICS last found in the October 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 18 sites matched. 2 sites at this grid supply point couldn’t be matched between the two editions, because their details changed or they appear in only one.
2 sites without a match in the other edition
In the November 2026 edition only (1)
- STEELSTRATH 1037KVA/500KWNorth of Scotland (SHEPD)Accepted to connect0.001 MW
In the October 2026 edition only (1)
- SALES SCOTLAND ENERGETICSNorth of Scotland (SHEPD)Accepted to connectListed at under 1 MW in the November 2026 edition0.225 MW
- PEATTIE FARM PVNovember 2026 editionExport capacity changed from 0.8 MW to 49.7 MW
- LITTLE BARRAS FARM PV & BESSOctober 2026 editionExport capacity changed from 74 MW to 0.42 MW
- PEATTIE FARM PVOctober 2026 editionExport capacity changed from 49.7 MW to 0.8 MW
- LITTLE BARRAS FARM PV & BESSSeptember 2026 editionExport capacity changed from 0.42 MW to 74 MW
- LITTLE BARRAS FARM PV & BESSAugust 2026 editionExport capacity changed from 74 MW to 0.42 MW
- PEATTIE FARM PVAugust 2026 editionExport capacity changed from 0.8 MW to 49.7 MW
- WITH CCM - DGENAugust 2026 editionExport capacity changed from 52.6 MW to 25 MW
- PEATTIE FARM PVJuly 2026 editionExport capacity changed from 49.7 MW to 0.8 MW
- WITH CCM - DGENJuly 2026 editionExport capacity changed from 25 MW to 52.6 MW
- LITTLE BARRAS FARM PV & BESSJune 2026 editionExport capacity changed from 0.42 MW to 74 MW
- WITH CCM - DGENJune 2026 editionExport capacity changed from 52.6 MW to 25 MW
- PEATTIE FARM PVMay 2026 editionExport capacity changed from 0.8 MW to 49.7 MW
- WITH CCM - DGENMay 2026 editionExport capacity changed from 25 MW to 52.6 MW
- LITTLE BARRAS FARM PV & BESSApril 2026 editionExport capacity changed from 74 MW to 0.42 MW
- WITH CCM - DGENApril 2026 editionExport capacity changed from 52.6 MW to 25 MW
- LITTLE BARRAS FARM PV & BESSFebruary 2026 editionExport capacity changed from 50 MW to 74 MW
- PEATTIE FARM PVFebruary 2026 editionExport capacity changed from 49.7 MW to 0.8 MW
- WITH CCM - DGENFebruary 2026 editionExport capacity changed from 25 MW to 52.6 MW
- HIILLHEAD OF AUQUIREApril 2025 editionTechnology stated as Wind (not stated in the March 2025 edition)
- BROTHERTON WIND GENERATING STATIONNovember 2023 editionCapacity changed from 4.842 MW to 4.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.