LITTLE BARRAS FARM PV & BESS
At FIDDES
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Jan 2033
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- LITTLE BARRAS FARM PV & BESS
- Address
- LITTLE BARRAS FARM, AB30 1LQ FORDOUN, LAURENCEKIRK, KINCARDINESHIRE, AB30 1LQ
- Grid reference
- Easting 381655, northing 779137
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- FIDDES
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 74 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 0.42 MW registered
- Registered capacity
- 74 MW
- Change to maximum export capacity
- 0.42 MW
- Change to maximum import capacity
- 0.42 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 8 Sep 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- October 2025 edition
Change history
Tracked since the October 2025 edition, across 14 editions.
Changes to the details QueueWatch tracks, newest first.
- October 2026 editionExport capacity changed from 74 MW to 0.42 MW
- September 2026 editionExport capacity changed from 0.42 MW to 74 MW
- August 2026 editionExport capacity changed from 74 MW to 0.42 MW
- June 2026 editionExport capacity changed from 0.42 MW to 74 MW
- April 2026 editionExport capacity changed from 74 MW to 0.42 MW
- February 2026 editionExport capacity changed from 50 MW to 74 MW
- November 2025 editionTarget energisation date stated as 31 Jan 2033 (not stated in the October 2025 edition)
Also at FIDDES
GSP view18 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 456 MW: 86 MW connected, 370 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?