LANE END ENERGY CENTRE
P3P PARTNERS LLP at FAWLEY GSP
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Apr 2026
- Status
- Accepted to connect
- Customer
- P3P PARTNERS LLP
- Site name
- LANE END ENERGY CENTRE
- Address
- ARRETON VALLEY NURSERY, MAIN ROAD ARRETON, NEWPORT, ISLE OF WIGHT, PO30 3AR
- Grid reference
- Easting 454717, northing 84542
- Licence area
- Southern England (SEPD)
- Grid supply point
- FAWLEY GSP
- Bulk supply point
- COWES & WOOTTON COMMON
- Primary substation
- ARRETON NURSERIES
- Connection voltage
- 33 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- ADVANCED FUEL GASIFICATION OR PYROLYSIS, GAS TURBINE (OCGT): 4.6 MW registered
- Registered capacity
- 4.6 MW
- Change to maximum export capacity
- 0 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 30 Jan 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 30 Apr 2026 (not stated in the October 2025 edition)
- July 2025 editionTechnology stated as Bioenergy and waste (not stated in the June 2025 edition)
Also at FAWLEY GSP
GSP view26 other sites at this grid supply point in the November 2026 edition, 2 of them at ARRETON NURSERIES, the same primary substation. In all, the sites here total 692 MW: 473 MW connected, 219 MW accepted to connect.
- ARRETON VALLEY NURSERYTHE ISLE OF WIGHT ENERGY COMPANY LIMITED, Solar, ARRETON NURSERIES primaryConnected33.25 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?