NORTH DAIRY FARM - SOLAR PV (FLEXIBLE CONNECTION)

BSR APPLICATIONS LIMITED at MANNINGTON GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
28 Jan 2027
Status
Accepted to connect
Planning consent
Granted 15 Jan 2024
Dorset, reference P/FUL/2021/01018 · Source: REPD
Contract for Difference
Allocation Round 6
Customer
BSR APPLICATIONS LIMITED
Site name
NORTH DAIRY FARM - SOLAR PV (FLEXIBLE CONNECTION)
Address
NORTH DAIRY FARM, PULHAM, DORCHESTER, DORSET, DT2 7EA
Grid reference
Easting 371610, northing 108186
Licence area
Southern England (SEPD)
Grid supply point
MANNINGTON GSP
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 50 MW registered
Registered capacity
50 MW
Change to maximum export capacity
49.9 MW
Change to maximum import capacity
0.475 MW
Flexible connection
Yes
In a connection queue
Not published by SSEN
Date accepted
21 Nov 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 28 Jan 2027 (not stated in the October 2025 edition)

Also at MANNINGTON GSP

GSP view

92 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 92

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.

Contract for Difference

The Contracts for Difference allocation round for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition. QueueWatch matched the site to that record.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.