Bsr applications limited
Customer named in the DNOs’ registers
In UKPN’s November 2026, NGED’s August 2026, SSEN’s November 2026 and ENWL’s October 2026 editions
The registers spell this customer’s name more than one way: “Bsr applications limited” (13 sites), “BSR APPLICATIONS LIMITED” (6 sites), “BSR Applications Limited” (5 sites), “BSR APPLICATIONS LTD” (3 sites) and “BSR Applications” (2 sites).
Capacity by DNO
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Storage | 10 | 1.2 GW | – | 1.2 GW |
| Solar | 18 | 1.2 GW | – | 1.2 GW |
| Wind | 1 | 180 MW | – | 180 MW |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs’ latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| Iron Acton 132Kv S Stn | NGED | 2 | – | 310 MW |
| West Burton 132Kv S Stn | NGED | 2 | – | 290 MW |
| HEYSHAM GSP | ENWL | 1 | – | 240 MW |
| NEW GSP NEXT TO HEYSHAM | ENWL | 1 | – | 240 MW |
| Shrewsbury 132Kv S Stn | NGED | 1 | – | 240 MW |
| Bicker Fen 132Kv S Stn | NGED | 1 | – | 200 MW |
| ELGIN | SSEN | 1 | – | 180 MW |
| Abham Sgp | NGED | 1 | – | 150 MW |
| Berkswell 132Kv S Stn | NGED | 2 | – | 148 MW |
| Norwich | UKPN | 2 | – | 113 MW |
| BRAMLEY (BASI) | SSEN | 1 | – | 70 MW |
| MANNINGTON GSP | SSEN | 1 | – | 50 MW |
| Walpole | UKPN | 1 | – | 50 MW |
| HARKER NEW | ENWL | 1 | – | 49.9 MW |
| Bridgwater Sgp | NGED | 2 | – | 45.5 MW |
| Watford South | UKPN | 1 | – | 38 MW |
| BRAMLEY (FLEE) | SSEN | 1 | – | 36 MW |
| Burwell | UKPN | 1 | – | 30 MW |
| Taunton Sgp | NGED | 1 | – | 30 MW |
| COWLEY GSP | SSEN | 1 | – | 20 MW |
| MELKSHAM GSP | SSEN | 1 | – | 20 MW |
| Bramford | UKPN | 1 | – | 15 MW |
| Kingsnorth | UKPN | 1 | – | 15 MW |
| Ironbridge 132Kv S Stn | NGED | 1 | – | 10 MW |
What changed recently
Changes to its sites found in both editions of each pair, newest first.
UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 7 sites matched. 2 sites couldn’t be matched between the two editions, because their details changed or they appear in only one.
2 sites without a match in the other edition
In the October 2026 edition only (2)
- (ANM - N/A) Raymonds FarmEastern Power Networks (EPN)Accepted to connect239.99 MW
- (ANM) Hill Green FarmEastern Power Networks (EPN)Accepted to connect95 MW
Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.
SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 6 sites matched. Every October site and every November site had a match in the other edition.
ENWL, September 2026 edition to October 2026 edition, for this customer’s sites: 3 sites matched. Every September site and every October site had a match in the other edition.
- Land At Harp FarmUKPN, November 2026 editionTarget energisation date moved from 30 Apr 2025 to 31 Oct 2027 (30 months later)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?